NASA and the U.S. Department of Energy signed the memorandum of understanding “Accelerating American Leadership in Space Nuclear Power and Propulsion” in October 2026, replacing and revising two earlier agreements. Effective November 1, the 10-year framework covers nuclear research, fuel production, system fabrication, testing, launch integration, and operations. NASA is targeting a launch-ready lunar surface reactor by 2030; the Space Reactor-1 Freedom milestone is planned for 2028, followed by Lunar Reactor-1.
The partnership assigns NASA mission authority, system installation and testing, and operational data-sharing, while DOE handles design, fabrication, fuel production, evaluation, testing, delivery, nuclear-material authorization, and prelaunch safety support. Fission surface power is intended to provide safe, continuous electricity for years without refueling, reducing dependence on solar generation during the approximately 14-day lunar night and improving resilience against dust, eclipses, and damaged power infrastructure.
The Ark team should track SR-1 Freedom and Lunar Reactor-1 schedules, reactor power class, fuel cycle, shielding mass, heat rejection, maintenance requirements, launch safety, and licensing. Ark architecture should reserve protected reactor interfaces, segregated power buses, thermal-radiator capacity, spare-control electronics, and autonomous shutdown capability, while researching long-duration reactor operations, waste isolation, component standardization, and failure-tolerant microgrids.


