ISRU Mining & Extraction
L3-ISR-CTRL-DIAG CRITICAL COMMAND CONTROL Level 3 · software

Equipment Health and Predictive Diagnostics

Vibration + Thermal + ML Anomaly Detection for ISR Hardware

Equipment Health and Predictive Diagnostics is a software module executed from radiation-hardened NOR flash that fuses vibration spectra, motor current signatures, bearing temperatures, and process-output deviations to estimate health states and remaining useful life for up to 50 resource utilization units. The lunar operating regime complicates diagnostic modeling: abrasive regolith dust accelerates mechanical bearing wear, while radiation-induced single-event upsets generate spurious telemetry that requires de-glitching and voting filters. With an anomaly detection latency of five minutes, the module provides a maintenance lead time of two to four weeks to schedule robotic servicing before hardware degradation halts production.

Predictive-maintenance and equipment-health module that fuses vibration spectra, motor currents, bearing temperatures, and process-output deviations into health-state estimates and remaining-useful-life predictions for each piece of ISR equipment.

Purpose

Anticipate equipment wear-out and impending failures with enough lead time for L1-MNT robotic maintenance to be scheduled — preventing cascading failures and downstream production stops.

Context

Receives sensor telemetry from every L3-ISR-* subsystem; outputs health estimates to L3-ISR-CTRL-SCHED (for load balancing) and L1-MNT (for replacement scheduling). Parallels L3-ESS-MGMT-SOH for the storage subsystem.

Principles

Typical implementations

Lunar considerations

Specifications

Functional

primary functionPredictive health monitoring and RUL prediction for ISR equipment
inputsSensor telemetry from all L3-ISR-* equipment (vibration, current, temperature, output), Historical maintenance records from L1-DVT, Latest ML model from authenticated update
outputsPer-equipment health state estimates, RUL predictions, Maintenance recommendations to L1-MNT, Anomaly alerts to L3-ISR-CTRL-SCHED for load shifting
supported modelsempirical, physics-based, LSTM anomaly detector, particle filter RUL
anomaly detection latency min5
rul uncertainty days at 1 month horizon5
supported equipment count50
maintenance lead time recommendation weeks min2

Physical

mass kg0.0
dimensionsSoftware on L3-ISR-CTRL-PROC
materialsCode on rad-hard NOR flash
operating temperature c-40, 70

Operational

power consumption w1.5
thermal range c-40, 70
lifetime years100
mtbf hours500000

Interfaces

Provides

Requires

Share

Cite this entry

Lunar Ark Codex. "Equipment Health and Predictive Diagnostics" (L3-ISR-CTRL-DIAG). Retrieved 10 September 2026, from https://lunarark.com/entry/L3-ISR-CTRL-DIAG

Licensed CC-BY-SA 4.0. You may reuse and adapt this entry with attribution, under the same licence.

View in the graph Back to the Ark